See what we’ve done
Design, engineering, procurement, construction, operation and maintenance of a grid connected 4.8MWp BIPV and BAPV solar project at DEWA HQ in Dubai. The project has started and is projected to be completed in 2022. The scope includes a combination of custom rooftop PV panels, solar integrated with the façade, solar attached to fins as well as solar in tree-like canopy features.
We completed the design, engineering, procurement, construction and the operation and maintenance of a grid connected 6.5MWp solar PV project by EMAAR at their new mall, Dubai Hills Regional Mall, in two installations of 4MWp MEP enclosure rooftop and a 2.5MWp carpark shade structure. JinkoSolar and Huawei have been selected as the PV module and inverter suppliers, respectively. The project was completed in Q2 of 2021.
We worked on the engineering, procurement, construction and the operation and maintenance of the grid connected 3MWp Solar PV Plant at IKEA Supply (Middle East) at their distribution center located in Dubai World Central Free Zone. Sunpower and SMA were selected as the PV module and inverter suppliers. The project was completed in 2021. Nomadd robots are cleaning the panels.
Design, engineering, procurement, construction and the operation and maintenance of a grid connected, 3.1 MWp solar PV rooftop and carpark project by Al Nabooda at their car manufacturing facility in DIC, Dubai. JinkoSolar and ABB Industries LLC were selected as the PV module and inverter suppliers. The project was completed in Q1 of 2021.
We were appointed for the design, engineering, procurement, construction and the operation and maintenance of a grid connected, 1.24MWp solar truck port PV project in Dubai. ALEC Energy installed all civil-, structural- and ground works related to the truck port. The project was completed in Q4 of 2021.
We were appointed to design, engineer, build, operate and maintain the grid connected, 0.12MWp solar PV project at a luxury villa in Dubai. The project will be completed in Q4 of 2022.
AES designed, supplied and installed the PV subframe and installed the custom-made glass-glass ViaSolis modules. ALEC Energy designed and installed all electrical components and will complete the grid connection.
Supply and overseeing of installation for all solar installations at the grid connected 0.15MWp solar PV project by EMAAR at the Mobility Pavilion to be used to satisfy specific LEED requirements for EXPO 2020. SunPower and Huawei were selected as the PV module and inverter suppliers. The project was completed in Q2 of 2020.
We completed the engineering, procurement, construction and the operation and maintenance of this grid connected site totals 5.5MWp for Nestle Middle East. The site comprises of a ground mounted system at Nestle Dubai South. JinkoSolar and Huawei were selected as the PV module and inverter suppliers. The project was completed in 2020 and O&M in 2022.
We were appointed for the design, engineering, procurement, construction and the operation and maintenance of a grid connected, 501 kWp solar PV project by ALEC Engineering and Contracting LLC at their heavy equipment and plant storage yard in DIC, Dubai. The project was completed in Q4 of 2022.
Located within the MBRZ Solar Park where a 700 MW CSP and 250 MW Solar Hybrid PV Hybrid IPP (in Phase IV) are being built, ALEC Energy, designed and built the world’s first Thermal Storage + GenSet + Solar + Battery hybrid power system. Projected to be completed in Q4 of 2022.
We were appointed for the design, engineering, procurement, construction and the operation and maintenance of a grid connected, 700kWp solar PV project by ALEC Engineering and Contracting LLC at their heavy equipment and plant storage yard in DIC, Dubai. The project was completed in Q4 of 2022
ALEC Energy (established 2015) is a business division of ALEC Engineering and Contracting L.L.C., offering a complete turnkey solution for on-grid and off-grid, ground mounted, rooftop and hybrid solar PV plants.