We were appointed for the design, engineering, procurement, construction and the operation and maintenance of a grid connected, 1.24MWp solar truck port PV project in Dubai. ALEC Energy installed all civil-, structural- and ground works related to the truck port. The project was completed in Q4 of 2021.
1.24 MWp Solar PV Truck Port Project at Nestlé Waters in Dubai
We were appointed for the design, engineering, procurement, construction and the operation and maintenance of a grid connected, 1.24MWp solar truck port PV project in Dubai. ALEC Energy installed all civil-, structural- and ground works related to the truck port. The project was completed in Q4 of 2021.