We were appointed to design, engineer, build, operate and maintain the grid connected, 0.12MWp solar PV project at a luxury villa in Dubai. The project will be completed in Q4 of 2022. AES designed, supplied and installed the PV subframe and installed the custom-made glass-glass ViaSolis modules. ALEC Energy designed and installed all electrical components and will complete the grid connection.