Located within the MBRZ Solar Park where a 700 MW CSP and 250 MW Solar Hybrid PV Hybrid IPP (in Phase IV) are being built, ALEC Energy, designed and built the world’s first Thermal Storage + GenSet + Solar + Battery hybrid power system. Projected to be completed in Q4 of 2022.