Dubai Hills Mall

Project details

  • Client: EMAAR
  • Capacity: 6.5MWp
  • Status: July 2018 - Ongoing

6.5MWp Solar PV Rooftop and Carpark Project

ALEC Energy has been appointed to provide design, engineering, procurement, construction and the operation and maintenance of a grid-connected 6.5MWp solar PV project by EMAAR at their new mall, Dubai Hills Regional Mall, in two installations of 4MWp MEP enclosure rooftop and a 2.5MWp carpark shade structure. JinkoSolar and Huawei have been selected as the PV module and inverter suppliers respectively. The project has achieved EPC Contract signing and is now in the process of obtaining DEWA NOC1. Construction is to begin in Q2 2019.