CPL Aromas

Project details

  • Client: CPL Aromas
  • Capacity: 0.43MWp
  • Status: February 2018 - Ongoing

0.43MWp Solar PV Rooftop Project

ALEC Energy has been appointed to provide design, engineering, procurement, construction and the operation and maintenance of a grid-connected 0.43MWp solar PV project by CPL Aromas at their perfume manufacturing facility in DIC, Dubai. JinkoSolar and ABB have been selected as the PV module and inverter suppliers respectively. The project is currently underway and is to be completed in Q2 2019.